Plumbing Solutions for Commercial Interiors

Plan water and drainage connections around the real positions of pantries, washrooms and other wet areas, with attention to access, existing connection points and the constraints of the building.

Plumbing Solutions
From our project archive

What this service covers

Plumbing changes require more than selecting fixtures. Available routes, drainage levels, isolation points and maintenance access must be reviewed before joinery and finishes are closed, with testing and reinstatement responsibilities clearly assigned.

Wet-area coordination

Check fixture positions and service routes against the architectural and joinery layouts.

Connection and isolation plan

Identify existing tie-ins and how agreed works can be isolated for installation.

Testing and access review

Confirm the appropriate checks and keep serviceable components accessible after finishing.

Delivery process

  1. Survey connection points and level constraints
  2. Coordinate fixtures, cabinets and pipe routes
  3. Install and inspect before concealment
  4. Test the agreed works and reinstate finishes

Industries we serve

Office pantries

Coordinate sinks, appliances and concealed pipework with cabinetry and cleaning access.

Hospitality support areas

Plan staff-use facilities around operating patterns and existing wet-service locations.

Commercial washrooms

Review fixture arrangements and access to valves and drainage connections.

Frequently asked questions

Can a pantry be moved to any part of the floor?

Not always. Drainage levels, available routes, structural restrictions and landlord requirements can limit where wet areas can be relocated.

Are sanitary fixtures included in a plumbing package?

They can be included or client-supplied. The scope should identify fixture models, supply responsibility and installation requirements.

When should plumbing be checked before closing joinery?

Inspect connections and complete the relevant tests before concealment, while valves and joints remain accessible for checks and correction.

How are shutdowns coordinated in an occupied building?

Agree the isolation points, affected users, notice period and work window with the responsible building team before making connections.