Bring architectural and building-service information into a coordinated review environment, so spatial conflicts and unresolved interfaces can be discussed before they reach site installation.

BIM Coordination
Project reference: installed ceiling services; not a BIM model.

What this service covers

BIM coordination depends on consistent model inputs and an agreed review process. Model versions, coordinates, information requirements and issue ownership should be defined, then clashes prioritised by construction impact rather than treated as an undifferentiated report.

Model federation setup

Agree coordinate alignment, version naming and the models required for each review.

Clash and interface review

Focus on buildable clearances, service crossings and access rather than geometry alone.

Issue tracking

Assign actions and record decisions so revised information can be checked at the next review.

Delivery process

  1. Agree model inputs and coordination rules
  2. Federate the current discipline models
  3. Review and assign priority issues
  4. Check revisions and record coordination status

Industries we serve

Commercial fit-out teams

Coordinate ceilings, partitions and services in constrained office interiors.

Multi-floor projects

Track repeated details while distinguishing floor-specific conditions and changes.

Design consultants

Share model issues with clear locations, ownership and review status.

Frequently asked questions

Is a BIM model the same as a clash-free construction design?

No. Model coordination supports reviews, but design responsibility, installation tolerances and site verification remain essential.

What files are needed to begin BIM coordination?

Agree the required model formats, discipline files, coordinates, revision status and information requirements with the project team.

How are clashes prioritised?

Review their effect on installation, access, programme and other disciplines, then assign actionable issues to the responsible team.

Does BIM coordination replace site measurements?

No. Existing conditions and critical dimensions still need verification; model accuracy depends on the quality and currency of the source information.